EICRs, testing and remedials
Electrical Installation Condition Reports, fixed-wire testing and the remedial work identified for the agreed commercial areas.
Commercial electrical
EICRs, testing and remedials, fault finding, lighting, power supplies, distribution upgrades and EV charger installation across Staffordshire, the West Midlands and Warwickshire.
Discuss commercial electrical work
Commercial capability
Jackson supports facilities managers, estates teams and principal contractors with electrical installation, inspection, repair and planned upgrade work coordinated around access and how the site operates.
Electrical Installation Condition Reports, fixed-wire testing and the remedial work identified for the agreed commercial areas.
Investigation and repair of electrical faults, with the affected equipment, access and operational constraints reviewed before work proceeds.
Replacement fittings, LED and controls upgrades, external lighting, emergency-lighting maintenance and related repairs.
New or altered supplies and circuits for commercial equipment and building requirements, based on the existing installation and agreed scope.
Distribution-board and three-phase board upgrades or replacements planned around supply, shutdown and site requirements.
EV charger installation for commercial premises and suitable properties, subject to review of location, electrical capacity and agreed equipment.

Commercial power restoration example
On an instructed visit involving an Aldi store, Jackson worked within the relevant scoped SIP authorisation to replace failed main fuses and test the installation before power was restored.
Restoring supply enabled the store to trade. The example describes Jackson's scoped role only; response arrangements and outcomes depend on each incident.

School and lighting experience
At Arthur Terry School, Jackson's LED lighting work was carried out for an Equans-managed school site and planned around an occupied education environment.
Jackson's own access equipment supports lighting installation and maintenance at height, with the equipment and arrangements assessed for each site.
A useful brief
Identify the building, affected areas, reported faults, equipment or planned installation and the outcome you need reviewed.
Share available reports, photographs, schedules, equipment information or the project specification through the appropriate channel.
Include opening hours, term dates, access at height, supply capacity, shutdown restrictions and preferred work periods.
The final scope depends on the existing installation, available supply, equipment and site constraints. EV charging, distribution and energy comparisons require site-specific review rather than a universal claim.
Estates and facilities questions
Jackson provides EICRs, testing and electrical remedials. Share the site details and any existing report so the required scope can be reviewed.
Distribution-board and three-phase upgrade work can be reviewed. Existing supply, shutdown, access and installation details are needed before agreeing the work.
Yes. Jackson installs EV chargers. The location, available electrical capacity, proposed equipment and site requirements need to be reviewed for each installation.
Access and site operations are considered when the programme is agreed. Share term dates or opening hours and the work periods available.
Next step
Tell us which site and areas need work, the electrical requirement and how the building operates. The team can review the scope, access arrangements and next steps.